{"id":28911,"date":"2025-11-18T14:13:01","date_gmt":"2025-11-18T07:13:01","guid":{"rendered":"https:\/\/merdekacoppergold.com\/?p=28911"},"modified":"2025-11-18T14:18:03","modified_gmt":"2025-11-18T07:18:03","slug":"pani-gold-mine-completes-c3-commissioning-with-first-ore-crushing","status":"publish","type":"post","link":"https:\/\/merdekacoppergold.com\/en\/pani-gold-mine-completes-c3-commissioning-with-first-ore-crushing\/","title":{"rendered":"Pani Gold Mine Completes C3 Commissioning with First Ore Crushing"},"content":{"rendered":"<p><strong>The steady hum <\/strong>of machinery filled the air as ore passed through the series of equipment at the Ore Preparation Plant (OPP) of the Pani Gold Mine in Pohuwato Regency, Gorontalo Province, on 12 November 2025. The material entered the crusher, where it was broken down into smaller sizes, before moving along conveyors toward the vibrating screen, which ensures that all material meets the size specifications for the next stage. Throughout this process, automated control systems monitored and adjusted material flow to keep operations running smoothly.<\/p>\n<p>The first ore crushing marked a key milestone confirming that OPP\u2019s core facilities can operate under near-full-load conditions. This trial is part of C3 Commissioning, an operational test using real ore to verify equipment integration, process stability, and overall system readiness. Earlier stages\u2014C1 and C2\u2014validated the design and installation through documentation checks and static testing before the equipment was energized. C3 is the dynamic testing phase using actual material, while C4 will serve as the final optimization and performance-validation stage before the facility is declared ready for commercial operations.<\/p>\n<p>With C3 completed, the technical team is now fine-tuning process parameters\u2014from conveyor speed and crusher capacity to vibrating-screen frequency\u2014to achieve the most efficient configuration ahead of C4 Commissioning. This process ensures the entire gold-production system operates stably and in full alignment with the design.<\/p>\n<p>\u201cThis C3 milestone is the result of the team\u2019s hard work and the support of our stakeholders,\u201d said Boyke Poerbaya Abidin, President Director of <span style=\"color: #993300;\"><a style=\"color: #993300;\" href=\"https:\/\/merdekagoldresources.com\/en\/about-us\/\">PT Merdeka Gold Resources Tbk<\/a><\/span> (MGR), the company operating the Pani Gold Mine, which recently <a href=\"https:\/\/merdekacoppergold.com\/en\/pt-merdeka-gold-resources-tbk-officially-listed-on-idx-raises-rp4-66-trillion-from-ipo\/\"><span style=\"color: #993300;\">listed on the Indonesia Stock Exchange<\/span><\/a> following its parent company, <span style=\"color: #993300;\"><a style=\"color: #993300;\" href=\"https:\/\/merdekacoppergold.com\/en\/\">PT Merdeka Copper Gold Tbk<\/a><\/span>. \u201cWe are moving steadily toward full operations, which will bring economic benefits, job opportunities, and social value to surrounding communities.\u201d<\/p>\n<p>This progress builds on a series of key milestones achieved by the Pani Gold Mine throughout the year. On 1 October 2025, initial mining activities began with the <span style=\"color: #993300;\"><a style=\"color: #993300;\" href=\"https:\/\/merdekacoppergold.com\/en\/first-mining-pani-gold-mine-officially-begins-operations\/\">first digging<\/a><\/span>. Only after the <span style=\"color: #993300;\"><a style=\"color: #993300;\" href=\"https:\/\/merdekacoppergold.com\/en\/mgr-completes-ore-preparation-plant-at-pani-gold-mine\/\">completion of the OPP construction<\/a><\/span> was the first crushing carried out as an initial step to verify processing readiness. With the completion of the C3 stage, the Pani Gold Mine is now moving closer to its first gold production, targeted for the first quarter of 2026.<\/p>\n<p>To ensure first gold production stays on schedule, MGR has taken various steps throughout project development, including <span style=\"color: #993300;\"><a style=\"color: #993300;\" href=\"https:\/\/merdekacoppergold.com\/en\/thirty-million-va-electricity-officially-powers-pani-gold-mine-operations\/\">signing a Renewable Energy Certificate<\/a><\/span> (REC) agreement with PLN to secure a renewable electricity supply for Pani operations. With ore reserves of 190 million tonnes containing 4.8 million ounces of gold\u2014making it one of Indonesia\u2019s largest primary gold deposits\u2014the project is being developed to operate with stronger sustainability standards.<\/p>\n<p><img decoding=\"async\" class=\"alignnone wp-image-28903 size-full\" src=\"https:\/\/merdekacoppergold.com\/wp-content\/uploads\/2025\/11\/DSC00182_w.jpg\" alt=\"\" width=\"1616\" height=\"1080\" srcset=\"https:\/\/merdekacoppergold.com\/wp-content\/uploads\/2025\/11\/DSC00182_w.jpg 1616w, https:\/\/merdekacoppergold.com\/wp-content\/uploads\/2025\/11\/DSC00182_w-300x200.jpg 300w, https:\/\/merdekacoppergold.com\/wp-content\/uploads\/2025\/11\/DSC00182_w-1024x684.jpg 1024w\" sizes=\"(max-width: 1616px) 100vw, 1616px\" \/><\/p>\n<p><img decoding=\"async\" class=\"alignnone wp-image-28907 size-full\" src=\"https:\/\/merdekacoppergold.com\/wp-content\/uploads\/2025\/11\/DSC00224_w.jpg\" alt=\"\" width=\"1562\" height=\"1044\" srcset=\"https:\/\/merdekacoppergold.com\/wp-content\/uploads\/2025\/11\/DSC00224_w.jpg 1562w, https:\/\/merdekacoppergold.com\/wp-content\/uploads\/2025\/11\/DSC00224_w-300x201.jpg 300w, https:\/\/merdekacoppergold.com\/wp-content\/uploads\/2025\/11\/DSC00224_w-1024x684.jpg 1024w\" sizes=\"(max-width: 1562px) 100vw, 1562px\" \/><\/p>\n<p><img decoding=\"async\" class=\"alignnone wp-image-28905 size-full\" src=\"https:\/\/merdekacoppergold.com\/wp-content\/uploads\/2025\/11\/DSC00209_w.jpg\" alt=\"\" width=\"1256\" height=\"839\" srcset=\"https:\/\/merdekacoppergold.com\/wp-content\/uploads\/2025\/11\/DSC00209_w.jpg 1256w, https:\/\/merdekacoppergold.com\/wp-content\/uploads\/2025\/11\/DSC00209_w-300x200.jpg 300w, https:\/\/merdekacoppergold.com\/wp-content\/uploads\/2025\/11\/DSC00209_w-1024x684.jpg 1024w\" sizes=\"(max-width: 1256px) 100vw, 1256px\" \/><\/p>\n<p><img decoding=\"async\" class=\"alignnone wp-image-28909 size-full\" src=\"https:\/\/merdekacoppergold.com\/wp-content\/uploads\/2025\/11\/DSC00269_w.jpg\" alt=\"\" width=\"1616\" height=\"1080\" srcset=\"https:\/\/merdekacoppergold.com\/wp-content\/uploads\/2025\/11\/DSC00269_w.jpg 1616w, https:\/\/merdekacoppergold.com\/wp-content\/uploads\/2025\/11\/DSC00269_w-300x200.jpg 300w, https:\/\/merdekacoppergold.com\/wp-content\/uploads\/2025\/11\/DSC00269_w-1024x684.jpg 1024w\" sizes=\"(max-width: 1616px) 100vw, 1616px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The steady hum of machinery filled the air as ore passed through the series of equipment at the Ore Preparation Plant (OPP) of the Pani Gold Mine in Pohuwato Regency, Gorontalo Province, on 12 November 2025. The material entered the crusher, where it was broken down into smaller sizes, before moving along conveyors toward the [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":28901,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[167],"tags":[318,500,586,616],"class_list":["post-28911","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-about-merdeka","tag-investors-en","tag-our-business-en","tag-pani-gold-mine"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.4 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Pani Gold Mine Completes C3 Commissioning with First Ore Crushing &#8211; PT Merdeka Copper Gold Tbk<\/title>\n<meta name=\"description\" content=\"Pani Gold Mine completes C3 Commissioning marked by first ore crushing, bringing the project closer to first gold production in early 2026.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/merdekacoppergold.com\/en\/pani-gold-mine-completes-c3-commissioning-with-first-ore-crushing\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pani Gold Mine Completes C3 Commissioning with First Ore Crushing &#8211; PT Merdeka Copper Gold Tbk\" \/>\n<meta property=\"og:description\" content=\"Pani Gold Mine completes C3 Commissioning marked by first ore crushing, bringing the project closer to first gold production in early 2026.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/merdekacoppergold.com\/en\/pani-gold-mine-completes-c3-commissioning-with-first-ore-crushing\/\" \/>\n<meta property=\"og:site_name\" content=\"PT Merdeka Copper Gold Tbk\" \/>\n<meta property=\"article:published_time\" content=\"2025-11-18T07:13:01+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-11-18T07:18:03+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/merdekacoppergold.com\/wp-content\/uploads\/2025\/11\/DSC00247_w.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1579\" \/>\n\t<meta property=\"og:image:height\" content=\"1055\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Corporate Communications 2\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Corporate Communications 2\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/merdekacoppergold.com\/en\/pani-gold-mine-completes-c3-commissioning-with-first-ore-crushing\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/merdekacoppergold.com\/en\/pani-gold-mine-completes-c3-commissioning-with-first-ore-crushing\/\"},\"author\":{\"name\":\"Corporate Communications 2\",\"@id\":\"https:\/\/merdekacoppergold.com\/en\/#\/schema\/person\/c35e2169d32038857fc987af76a78a69\"},\"headline\":\"Pani Gold Mine Completes C3 Commissioning with First Ore Crushing\",\"datePublished\":\"2025-11-18T07:13:01+00:00\",\"dateModified\":\"2025-11-18T07:18:03+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/merdekacoppergold.com\/en\/pani-gold-mine-completes-c3-commissioning-with-first-ore-crushing\/\"},\"wordCount\":450,\"publisher\":{\"@id\":\"https:\/\/merdekacoppergold.com\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/merdekacoppergold.com\/en\/pani-gold-mine-completes-c3-commissioning-with-first-ore-crushing\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/merdekacoppergold.com\/wp-content\/uploads\/2025\/11\/DSC00247_w.jpg\",\"keywords\":[\"About Merdeka\",\"Investors\",\"Our Business\",\"Pani Gold Mine\"],\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/merdekacoppergold.com\/en\/pani-gold-mine-completes-c3-commissioning-with-first-ore-crushing\/\",\"url\":\"https:\/\/merdekacoppergold.com\/en\/pani-gold-mine-completes-c3-commissioning-with-first-ore-crushing\/\",\"name\":\"Pani Gold Mine Completes C3 Commissioning with First Ore Crushing &#8211; PT Merdeka Copper Gold Tbk\",\"isPartOf\":{\"@id\":\"https:\/\/merdekacoppergold.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/merdekacoppergold.com\/en\/pani-gold-mine-completes-c3-commissioning-with-first-ore-crushing\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/merdekacoppergold.com\/en\/pani-gold-mine-completes-c3-commissioning-with-first-ore-crushing\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/merdekacoppergold.com\/wp-content\/uploads\/2025\/11\/DSC00247_w.jpg\",\"datePublished\":\"2025-11-18T07:13:01+00:00\",\"dateModified\":\"2025-11-18T07:18:03+00:00\",\"description\":\"Pani Gold Mine completes C3 Commissioning marked by first ore crushing, bringing the project closer to first gold production in early 2026.\",\"breadcrumb\":{\"@id\":\"https:\/\/merdekacoppergold.com\/en\/pani-gold-mine-completes-c3-commissioning-with-first-ore-crushing\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/merdekacoppergold.com\/en\/pani-gold-mine-completes-c3-commissioning-with-first-ore-crushing\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/merdekacoppergold.com\/en\/pani-gold-mine-completes-c3-commissioning-with-first-ore-crushing\/#primaryimage\",\"url\":\"https:\/\/merdekacoppergold.com\/wp-content\/uploads\/2025\/11\/DSC00247_w.jpg\",\"contentUrl\":\"https:\/\/merdekacoppergold.com\/wp-content\/uploads\/2025\/11\/DSC00247_w.jpg\",\"width\":1579,\"height\":1055},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/merdekacoppergold.com\/en\/pani-gold-mine-completes-c3-commissioning-with-first-ore-crushing\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/merdekacoppergold.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Pani Gold Mine Completes C3 Commissioning with First Ore Crushing\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/merdekacoppergold.com\/en\/#website\",\"url\":\"https:\/\/merdekacoppergold.com\/en\/\",\"name\":\"PT Merdeka Copper Gold Tbk\",\"description\":\"Menjadi industri penghasil emas, perak, tembaga, dan mineral lainnya yang terkemuka di Indonesia\",\"publisher\":{\"@id\":\"https:\/\/merdekacoppergold.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/merdekacoppergold.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/merdekacoppergold.com\/en\/#organization\",\"name\":\"PT Merdeka Copper Gold Tbk\",\"url\":\"https:\/\/merdekacoppergold.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/merdekacoppergold.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/merdekacoppergold.com\/wp-content\/uploads\/2022\/02\/mcg-logo-color.png\",\"contentUrl\":\"https:\/\/merdekacoppergold.com\/wp-content\/uploads\/2022\/02\/mcg-logo-color.png\",\"width\":2800,\"height\":1226,\"caption\":\"PT Merdeka Copper Gold Tbk\"},\"image\":{\"@id\":\"https:\/\/merdekacoppergold.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.instagram.com\/ptmerdekacoppergoldtbk\/\",\"https:\/\/www.linkedin.com\/company\/pt-merdeka-copper-gold-tbk\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/merdekacoppergold.com\/en\/#\/schema\/person\/c35e2169d32038857fc987af76a78a69\",\"name\":\"Corporate Communications 2\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/merdekacoppergold.com\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/ca9e3bc8dfdb1e21dcd940b7e475171782794ff84d4a2f158e297190534dd7f7?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/ca9e3bc8dfdb1e21dcd940b7e475171782794ff84d4a2f158e297190534dd7f7?s=96&d=mm&r=g\",\"caption\":\"Corporate Communications 2\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Pani Gold Mine Completes C3 Commissioning with First Ore Crushing &#8211; PT Merdeka Copper Gold Tbk","description":"Pani Gold Mine completes C3 Commissioning marked by first ore crushing, bringing the project closer to first gold production in early 2026.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/merdekacoppergold.com\/en\/pani-gold-mine-completes-c3-commissioning-with-first-ore-crushing\/","og_locale":"en_US","og_type":"article","og_title":"Pani Gold Mine Completes C3 Commissioning with First Ore Crushing &#8211; PT Merdeka Copper Gold Tbk","og_description":"Pani Gold Mine completes C3 Commissioning marked by first ore crushing, bringing the project closer to first gold production in early 2026.","og_url":"https:\/\/merdekacoppergold.com\/en\/pani-gold-mine-completes-c3-commissioning-with-first-ore-crushing\/","og_site_name":"PT Merdeka Copper Gold Tbk","article_published_time":"2025-11-18T07:13:01+00:00","article_modified_time":"2025-11-18T07:18:03+00:00","og_image":[{"width":1579,"height":1055,"url":"https:\/\/merdekacoppergold.com\/wp-content\/uploads\/2025\/11\/DSC00247_w.jpg","type":"image\/jpeg"}],"author":"Corporate Communications 2","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Corporate Communications 2","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/merdekacoppergold.com\/en\/pani-gold-mine-completes-c3-commissioning-with-first-ore-crushing\/#article","isPartOf":{"@id":"https:\/\/merdekacoppergold.com\/en\/pani-gold-mine-completes-c3-commissioning-with-first-ore-crushing\/"},"author":{"name":"Corporate Communications 2","@id":"https:\/\/merdekacoppergold.com\/en\/#\/schema\/person\/c35e2169d32038857fc987af76a78a69"},"headline":"Pani Gold Mine Completes C3 Commissioning with First Ore Crushing","datePublished":"2025-11-18T07:13:01+00:00","dateModified":"2025-11-18T07:18:03+00:00","mainEntityOfPage":{"@id":"https:\/\/merdekacoppergold.com\/en\/pani-gold-mine-completes-c3-commissioning-with-first-ore-crushing\/"},"wordCount":450,"publisher":{"@id":"https:\/\/merdekacoppergold.com\/en\/#organization"},"image":{"@id":"https:\/\/merdekacoppergold.com\/en\/pani-gold-mine-completes-c3-commissioning-with-first-ore-crushing\/#primaryimage"},"thumbnailUrl":"https:\/\/merdekacoppergold.com\/wp-content\/uploads\/2025\/11\/DSC00247_w.jpg","keywords":["About Merdeka","Investors","Our Business","Pani Gold Mine"],"articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/merdekacoppergold.com\/en\/pani-gold-mine-completes-c3-commissioning-with-first-ore-crushing\/","url":"https:\/\/merdekacoppergold.com\/en\/pani-gold-mine-completes-c3-commissioning-with-first-ore-crushing\/","name":"Pani Gold Mine Completes C3 Commissioning with First Ore Crushing &#8211; PT Merdeka Copper Gold Tbk","isPartOf":{"@id":"https:\/\/merdekacoppergold.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/merdekacoppergold.com\/en\/pani-gold-mine-completes-c3-commissioning-with-first-ore-crushing\/#primaryimage"},"image":{"@id":"https:\/\/merdekacoppergold.com\/en\/pani-gold-mine-completes-c3-commissioning-with-first-ore-crushing\/#primaryimage"},"thumbnailUrl":"https:\/\/merdekacoppergold.com\/wp-content\/uploads\/2025\/11\/DSC00247_w.jpg","datePublished":"2025-11-18T07:13:01+00:00","dateModified":"2025-11-18T07:18:03+00:00","description":"Pani Gold Mine completes C3 Commissioning marked by first ore crushing, bringing the project closer to first gold production in early 2026.","breadcrumb":{"@id":"https:\/\/merdekacoppergold.com\/en\/pani-gold-mine-completes-c3-commissioning-with-first-ore-crushing\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/merdekacoppergold.com\/en\/pani-gold-mine-completes-c3-commissioning-with-first-ore-crushing\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/merdekacoppergold.com\/en\/pani-gold-mine-completes-c3-commissioning-with-first-ore-crushing\/#primaryimage","url":"https:\/\/merdekacoppergold.com\/wp-content\/uploads\/2025\/11\/DSC00247_w.jpg","contentUrl":"https:\/\/merdekacoppergold.com\/wp-content\/uploads\/2025\/11\/DSC00247_w.jpg","width":1579,"height":1055},{"@type":"BreadcrumbList","@id":"https:\/\/merdekacoppergold.com\/en\/pani-gold-mine-completes-c3-commissioning-with-first-ore-crushing\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/merdekacoppergold.com\/en\/"},{"@type":"ListItem","position":2,"name":"Pani Gold Mine Completes C3 Commissioning with First Ore Crushing"}]},{"@type":"WebSite","@id":"https:\/\/merdekacoppergold.com\/en\/#website","url":"https:\/\/merdekacoppergold.com\/en\/","name":"PT Merdeka Copper Gold Tbk","description":"Menjadi industri penghasil emas, perak, tembaga, dan mineral lainnya yang terkemuka di Indonesia","publisher":{"@id":"https:\/\/merdekacoppergold.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/merdekacoppergold.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/merdekacoppergold.com\/en\/#organization","name":"PT Merdeka Copper Gold Tbk","url":"https:\/\/merdekacoppergold.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/merdekacoppergold.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/merdekacoppergold.com\/wp-content\/uploads\/2022\/02\/mcg-logo-color.png","contentUrl":"https:\/\/merdekacoppergold.com\/wp-content\/uploads\/2022\/02\/mcg-logo-color.png","width":2800,"height":1226,"caption":"PT Merdeka Copper Gold Tbk"},"image":{"@id":"https:\/\/merdekacoppergold.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.instagram.com\/ptmerdekacoppergoldtbk\/","https:\/\/www.linkedin.com\/company\/pt-merdeka-copper-gold-tbk\/"]},{"@type":"Person","@id":"https:\/\/merdekacoppergold.com\/en\/#\/schema\/person\/c35e2169d32038857fc987af76a78a69","name":"Corporate Communications 2","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/merdekacoppergold.com\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/ca9e3bc8dfdb1e21dcd940b7e475171782794ff84d4a2f158e297190534dd7f7?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ca9e3bc8dfdb1e21dcd940b7e475171782794ff84d4a2f158e297190534dd7f7?s=96&d=mm&r=g","caption":"Corporate Communications 2"}}]}},"cc_featured_image_caption":{"caption_text":"","source_text":"","source_url":""},"_links":{"self":[{"href":"https:\/\/merdekacoppergold.com\/en\/wp-json\/wp\/v2\/posts\/28911","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/merdekacoppergold.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/merdekacoppergold.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/merdekacoppergold.com\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/merdekacoppergold.com\/en\/wp-json\/wp\/v2\/comments?post=28911"}],"version-history":[{"count":2,"href":"https:\/\/merdekacoppergold.com\/en\/wp-json\/wp\/v2\/posts\/28911\/revisions"}],"predecessor-version":[{"id":28913,"href":"https:\/\/merdekacoppergold.com\/en\/wp-json\/wp\/v2\/posts\/28911\/revisions\/28913"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/merdekacoppergold.com\/en\/wp-json\/wp\/v2\/media\/28901"}],"wp:attachment":[{"href":"https:\/\/merdekacoppergold.com\/en\/wp-json\/wp\/v2\/media?parent=28911"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/merdekacoppergold.com\/en\/wp-json\/wp\/v2\/categories?post=28911"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/merdekacoppergold.com\/en\/wp-json\/wp\/v2\/tags?post=28911"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}